KARACHI, Nov. 25 (Focus Pakistan) - Subsidies alone will not build Pakistan’s electric vehicle industry, they risk swapping a petrol import habit for a costly new addiction to imported EVs, batteries, and tech.
That is the blunt warning from the Institute of Cost and Management Accountants of Pakistan (ICMA) in its latest Economic Signal, “Can PAVE Shift Pakistan from EV Adoption to EV Industry?” For a cash-strapped economy constantly wrestling with external deficits and currency pressure, handing out purchase incentives without building domestic industrial muscle is a half-measure at best—and a fresh foreign-exchange trap at worst.
Fuel Volatility Keeps the Pressure On
Nobody needs a textbook to explain why Pakistan wants off imported fossil fuels. Petrol prices swung wildly through 2026, climbing from Rs. 266.17 per litre on March 1 to a peak of Rs. 458.41 in early April before working their way down to Rs. 319.00 on November 24. Even after that retreat, petrol sits roughly 19.85% higher than where it started in early March, a stark reminder of how quickly global oil shocks can squeeze household budgets, freight costs, and import bills.
Under the New Energy Vehicle (NEV) Policy 2025–30, the Pakistan Accelerated Vehicle Electrification (PAVE) programme was designed to push electric mobility forward through state subsidies, financing schemes, and rollout targets. Across Phase I and Phase II, the programme envisions roughly 116,000 electric bikes and 3,170 electric rickshaws and loaders, using subsidies and credit access to bring prices down for everyday riders and small commercial operators.
Approvals Rose, But Deliveries Lagged Behind
On paper, demand has not been the problem. In practice, getting vehicles from applications onto the road has been a slog.
During the initial rollout, 44,689 applications were forwarded to banks by May 2026, yet only 9,889, about 22.1%, were processed. Approvals came through in just 4,075 cases, or roughly 9.1% of the total, leaving 34,800 applications, nearly 78%, unprocessed. At that stage, financing stood at Rs. 143 million, while 5,409 vehicles were reported distributed.
Also Read: Cheaper EVs, Costlier Engines: What Pakistan’s New Auto Policy Means
Adjustments to the financing mechanism improved approval numbers later in the year. Government figures reported on October 28, 2026, showed banks had approved 21,918 applications worth approximately Rs. 3.06 billion. Even so, turning paper approvals into actual deliveries moved much slower: Rs. 1.093 billion had been disbursed across 5,506 loans, while 3,263 vehicles had reached customers.
Those numbers point to a familiar execution gap. Approving a loan is one hurdle; disbursing funds on time, clearing supply bottlenecks, and handing over keys or bikes is another. Without tight operational follow-through, ambitious rollout targets risk getting tangled in banking and delivery friction.
From Subsidy Scheme to Industrial Base
For ICMA, the real test for PAVE is whether it seeds a domestic manufacturing ecosystem or simply subsidises foreign suppliers. If electric bikes, rickshaws, batteries, and parts are mostly brought in from abroad, lower petrol spending could easily be offset by higher machinery and component imports.
The bigger opportunity lies in linking rising EV demand with local value addition. Expanding electric mobility can pull investment into local assembly, battery ecosystems, auto components, charging equipment, maintenance and repair services, battery recycling, and specialized engineering and technical skills. Over time, that builds domestic supply chains, industrial depth, and skilled jobs rather than leaving the auto sector dependent on imported hardware.
ICMA’s core argument is straightforward: PAVE cannot be treated merely as a consumer subsidy window. Positioned as a broader economic tool, it can connect cheaper daily transport and energy security with local manufacturing, capital investment, and technological capability, giving Pakistan a real industrial payoff instead of a new import bill.






